Position Summary:
Driving advanced facility commissioning, integrated testing, and operational handover for hyperscale data centres in Amsterdam, Clear is actively seeking an accomplished Commissioning Manager for a permanent professional engagement. In this vital technical leadership role, you will take full operational, tactical, and technical ownership of the end-to-end commissioning lifecycle (Levels 1 through 5), ensuring uncompromised system reliability, thermal performance, and electrical resilience across critical infrastructure.
Bringing extensive hands-on experience in mission-critical data centre commissioning, you will empower global engineering teams to achieve flawless integrated systems testing and seamless facility handover. This prestigious career opportunity offers competitive remuneration, rotation packages including working-away allowances, accommodation, and flights, alongside professional growth within a premier international executive recruitment and consulting enterprise.
Detailed Job Description:
As a Commissioning Manager supporting Clear on an on-site basis in Amsterdam, Netherlands, you will take full operational, tactical, and technical ownership of commissioning strategy, test script development, integrated systems testing (IST), and deficiency tracking. Your day-to-day responsibilities include leading multidisciplinary commissioning teams through electrical, mechanical, and automation testing phases, coordinating vendor representatives, resolving complex functional anomalies, collaborating with electrical and mechanical construction managers, and interacting directly with professional delivery consultants like Amelia Burrows.
Key Responsibilities:
Direct, manage, and oversee the complete commissioning lifecycle (Levels 1-5) for hyperscale data centre electrical, mechanical, and control systems.
Author, review, and approve comprehensive commissioning scripts, method statements, Standard Operating Procedures (SOPs), and IST protocols.
Lead Integrated Systems Testing (IST), simulated black-start testing, generator load-bank testing, and mechanical thermal load tests.
Coordinate onsite activities for third-party commissioning agents, equipment manufacturers, electrical contractors, and mechanical vendors.
Identify, log, track, and resolve commissioning snags, punch-list items, and operational deficiencies prior to client handover.
Ensure strict adherence to ASHRAE standards, Uptime Institute tier requirements, and local safety and environmental codes.
Collaborate seamlessly with construction managers, design engineers, operations teams, and client technical representatives.
Maintain meticulous commissioning documentation, test result sign-offs, calibration logs, and final handover certification packages.
Required Qualifications & Skills:
Bachelor's degree in Electrical Engineering, Mechanical Engineering, Building Services, or related technical discipline.
Minimum of 8+ years of progressive professional hands-on experience in testing and commissioning mission-critical data centres or complex industrial facilities.
Strong, demonstrable operational expertise in Level 1 through Level 5 commissioning processes for electrical (UPS, generators, switchgear) and mechanical (chillers, CRAC/CRAH) systems.
Comprehensive working knowledge of Uptime Institute tier classification standards and ASHRAE testing guidelines.
Deep practical experience in leading Integrated Systems Testing (IST) and managing complex deficiency tracking logs.
Solid practical grasp of building management systems (BMS), power monitoring systems (EPMS), and automated control logic.
Exceptional analytical problem-solving aptitude, leadership capabilities, and professional stakeholder communication skills.
Mandatory possession of a valid EU passport and physical availability for on-site rotation operations in Amsterdam, Netherlands.
Nice-to-Have Skills:
Professional commissioning certifications such as Certified Commissioning Authority (CxA) or Accredited Commissioning Process Manager (ACP-M).
Prior professional working experience in hyperscale data centre commissioning across Europe, North America, or Asia.
Hands-on familiarity with electrical power systems analysis software, thermal imaging, and vibration analysis tools.
Experience utilizing enterprise agile tracking platforms (Jira, Confluence) for deficiency tracking and project reporting.
Active participation in commissioning associations, IEEE societies, or critical facility operations think tanks.
Application Information:
Salary/Rate: Market Competitive Salary + Rotation Package (Working-away allowance, accommodation, and flights included)
Deadline: Open until filled (Urgent Amsterdam Data Centre Commissioning Manager Opening)
Notice Period: Immediate to 30 Days Preferred
Contract Duration: Permanent / Full-Time On-Site Rotation Engagement (Amsterdam, Netherlands)
Company Website: https://www.clear-er.com
Contact Name: Amelia Burrows (Delivery Consultant)
Recruitment Pro Tip:
When applying for this Commissioning Manager position through Clear, ensure your resume explicitly highlights your Level 1-5 commissioning portfolio, IST leadership record, and confirms your valid EU passport status.
Commissioning Manager (Data Centre Construction) | Clear | Amsterdam werkgever: Tech Junction Ltd
Hexowa Technologies Ltd biedt een stimulerende werkomgeving in Hengelo, waar teamwork en innovatie centraal staan. Als Desktop Support Engineer profiteer je van uitstekende groeimogelijkheden binnen een dynamisch IT-team, met toegang tot de nieuwste technologieën en trainingen. Wij waarderen een cultuur van samenwerking en ondersteuning, waardoor je niet alleen bijdraagt aan de dagelijkse IT-operaties, maar ook je vaardigheden kunt ontwikkelen in een collegiale sfeer.